Projects & Contacts

No

Contract No.

Project

Value

1

123-2005

Lighting works of kraimya- Aljazaer farm road

480,000.000

2

191-2005

Lighting works of agricultural road from 7April factory to Oum Alqura mosque

480,000.000

3

Agreement protocol

Demolition and disposing wastes to dumping area of buildings, yards, stores inside Al- Abyar army camp

2,285,605.400

4

Agreement protocol

Supplying Zamzam area with drinking water

487,620.000

5

Agreement protocol

Excavation works of water pipeline at Alwadi Alahmer

348,300.000

6

Agreement protocol

Destruction of buildings and preparing desalination plant location, cleaning and leveling of beach with 6 km long from 100 villas site

450,397.500

7

Agreement protocol

Demolition of building and removing obstacles at Ein Zara site

806,343.950

8

Agreement protocol

Demolition and dispose of wastes to dumping area, Sidi Alsaeh

646,680.000

9

Agreement protocol

Demolition of buildings and dispose of wastes to dumping area at northern Merg site

396,912.000

10

Agreement protocol

Supply of drinking water to Zamzam Alwadi AlAhmar, Alwadi Alahmer part

492,780.000

11

176/2007

Demolition, removing, excavation, and dumping of wastes at Benghazi, Alabyar, Sloog and Darna

6,859,955.000

12

W/0551/DD/07

Derj- wafa oil field road maintenance, ENI GAZ

2,300,000.000

13

249/2007

Paving, concrete works and execution of infrastructure for 370 residential units at Darna

28,860,000.000

14

23/2008

Paving, excavation and dumping of wastes for 370 residential units site at Darna, Alkashaf forest

29,507940.000

15

188/2008

Execution of 250 residential units at Tamzawa/Wadi Alshaty

28,900,000.000

16

19/01/2008

Execution of Nalut full infrastructure

82,982,862.180

17

76/19

Supplying of 700 residential units at the African union complex with drinking water

812,364.000

18

283/2008

Execution of 250 residential units, Sirt

51,497,625.000

19

Agreement protocol 76/67

Excavation works of pipeline for supplying Bir Altierfas residential area with water, Tripoli

2,580,000.00

20

G.C.M12/12/2009

Opening of right of ways & kerbstoneworks of roads at Ageeb 2, Alzaroog

487,150.848

21

Agreement protocol 331/2009

Maintenance of Merj immigration building

491,902.000

22

Agreement protocol 332/2009

Maintenance of Albaiyda immigration building

250,376.000

23

Agreement protocol 353/2009

Maintenance of Darna immigration building

262,852.000

24

C/0600/ME/08

Supply of equipment for Mellitah oil field site

6,200,000.000

25

C/0601/WA/08

Supply of equipment for Wafa oil field site

2,700,000.000

26

C/574/MA/08

Civil and electrical works for Air Quality Monitoring Stations at Mellitah

144,750.000

27

Agreement protocol A/WW384

Demolition and removal of debris and execution fencing of 500 residential units at Benghazi medical center

497,306.000

28

120/2009

Cleaning, leveling and wastes dumping at site surrounding the project of 100 hospitality villas, Sirt

7,435,004.000

29

161/2009

Demolition of buildings and preparing desalination plant location, cleaning and leveling of beach with 6 km long from 100 villas site

3,525,900.500

30

Agreement protocol 470/2009

Demolition of buildings opposite to Attahaddi University, Sirt

433,166.000

31

Agreement protocol E/A/M/595

First phase of clean-up project, dispose of wastes and grassing of the square facing the houses of hospitality district, African Union, Sirt

495,013.000

32

Agreement protocol E/A/W596

Second phase of clean-up project, dispose of wastes and grassing of the square facing the houses of hospitality district, African union, Sirt

497,991.000

33

Agreement protocol E/A/M/651

Cleaning works, wastes dispose and grassing Of squares opposite to the houses of senior visitors, Sirt

499,291.000

34

C/ 621/WA/09

Maintaining residential camp for Wafa oil field

210,580,000

35

181/2009

Maintenance of students’ house of oil institute to be used instead students’ house inside Al- Batnan university compound

3,599,949.500

36

182/2009

Supply of 100 residential units at Sirt with drinking water

1,404,200.000

37

234/2009

Executing of utilities of 370 residential units at Kashaf forest, Darna

5,554,240.000

38

235/2009

Demolition of 46 dilapidated multi floor buildings at Darna

9,655,933.000

39

C/0644/WA/10

Sand removal and internal road maintenance at wafa oil field

1,239,000.000

40

Work Order 3272

Executing metal fence along the two sides of the jointing road between Alsawawa intersection and Abu-Hadi roundabout

2,575,422.250

41

Work Order 3273

Road expansion of jointing road between Alsawawa intersection and Abu-Hadi roundabout

2,123,000.000

42

51/13/1-112009

Preparing and arranging of public dumping area at Tawarga

485,786.726

43

244/2009

Execution of infrastructure for 1000 residential Units, Sirt

60,107,000.000

44

245/2009

Execution of Service buildings at African union Quarter, Sirt

25,311,627.438

45

256/2009

Execution of 500 residential units southern of Morah Road, Sirt

102,995,250.000

46

Work Order

Supply of equipment for MAN Ferrostaal Oil & Gas Ltd. at Wafa oil field

404,500,250.000

47

Work Order

Erecting residential camp for Dietsmann Maintaining Energy Co. at Wafa oil field

90,000.000

48

Work Order 7363

Maintenance and furnishing of two buildings belongs to Africa village for hospitality, Sirt

450,000.000

49

Work Order

Maintenance and substitute of main sewage pipeline of 600 residential units, Sirt

2,123,000.000